Archives

Norcana

This two-storey office, shop and warehouse facility is constructed from conventional steel and insulated pre-cast wall panels and features an extensive yard.

read more

Holiday Inn Express

New construction of a four-storey, wood frame, 106-room hotel, complete with swimming pool and water slide. Hotels were built in both Calgary and Lethbridge.

read more

TD Creekside

This 7,700 sq ft, two-storey banking centre also features an extensive storage facility assembled from structural steel and steel stud construction.

read more

Newsco

Situated in SE Calgary, this 14,650 sq ft building is home to a two-storey office, shop and warehouse facility.

read more

Miller AG

A new 2-storey office and roof top patio, with a raised loading dock, explosion proof bulk oil storage area with associated containment, pull through truck washbay and vehicle maintenance shop.

read more

Joe Fresh

A 20,000 sq ft tenant improvement in CrossIron Mills shopping centre. The project turned an unfinished bay into one of the mall’s cornerstone stores. Work included modifications to the interior storefront and the installation of a 24’ x 35’ exterior sign.

read more

Frontier Power

This two-storey, design-build, is a 19,440 sq ft manufacturing, office and warehouse facility in SE Calgary. It was designed and constructed to allow for expansion into an adjoining storage yard.

read more

Dilawri East Lake

A 22,000 sq ft, multi-tenant office and warehouse facility was constructed from structural steel and pre-cast concrete.

read more

Chaparral Campus

A 103,000 sq ft indoor self-storage facility featuring a 5 bay car wash (and pet wash facility) all steel structure with concrete floor and pre fabricated external panels.

read more